Our state-of-the-art prefabrication shop in Ottawa is designed to minimize downtime during mechanical upgrades.
By streamlining the construction process, we guarantee shorter project schedules, quicker delivery, and increased productivity for your commercial or industrial operations.
Experience seamless efficiency and reduced disruption with our advanced prefabrication solutions.
How Can You Benefit?
Collaborations
Beyond interference.
Every piece of pipe or equipment on the coordination drawings is fabricated off-site.
MEP+D involvement at the time of LOI (Letter of Intent).
Eliminates shortage of installers and workforces.
Time
Eliminating fabrication time on-site.
Reducing site install time by 80%.
Providing access to the next trade 80% faster.
Why
What We Offer
What We Offer
What We Offer
Health & Safety
20% less site staff.
Removes nearly 5,000 steps per day per individual.
Speed
90% of project issues resolved months ahead.
Faster Install:
10% faster project delivery if a single trade is involved.
40% faster project delivery if MEP+D is involved.
Less time spent per room.
No need to return to units until finishing.
Coordination
General Contractor (GC) can have better control of the schedule. • Forecasting further deadlines vs. two-week pull planning.
Trades coordinating what goes in walls and not ceiling interference.
Less site deliveries.
Community
Reduce Carbon Footprint:
80% less site garbage.
Waste reduced by 30%.
Less vehicles on road delivery.
Fewer people.
Quality Control
Every measurement is designed and manufactured.
Work completed in a controlled and supervised environment.
Prefabrication in Action
See how our prefabrication shop has enhanced our client’s productivity on commercial and industrial projects.
Behind the Scenes at TPH
Less Time, More Collaboration
Streamline your projects with our off-site fabrication process, designed to save time and enhance collaboration across trades. Experience faster installations and reduced on-site delays.
-
Every piece of pipe or equipment on the coordination drawing is fabricated off-site
-
Eliminate shortage of installers and workforce
-
Eliminate fabrication time-on-site
-
Reduce site install time by 80%
-
Provide access to the next trade 80% faster
Speed and Coordination
Our process ensures faster project delivery and improved coordination, resolving most issues early on and giving contractors greater control over schedules. Benefit from fewer delays and enhanced collaboration across trades.
-
90% of project issues were resolved months ahead
-
10% faster project delivery if a single trade is involved
-
Less time spent per room
-
40% faster project delivery if MEP+D is involved
-
General Contractors have better control of the schedule
-
Forecast further deadlines instead of 2-week pull planning
-
Enables trades coordinating what goes in walls and not ceiling interference
-
Fewer site deliveries
Sustainability, Health and Safety Measures
Our approach promotes sustainability and prioritizes health and safety by minimizing waste, reducing site traffic, and ensuring work is done in a controlled, supervised environment.
-
Reduce carbon footprint by having less site garbage, waste, vehicles on road delivery and fewer people needed
-
Removes nearly 5,000 steps per day per individual
-
Work completed in a controlled and supervised environment
-
Every measurement is designed and manufactured